- Sat Oct 15, 2016 8:58 am
#6805
Hi all just changed my 4spd box over for the spare, we did it without removeing the engine had prim case off my son is a pretty cluey bloke reconed it could be done and did it. Take off the 4 nuts at back of box this lets you slide box back half an inch then you can loosen the four studs with slip joint pliers put 2 nuts on a stud lock em together and unscrew stud, do the other 3 same box can then be lifted wiggled out.installation reverse nb top 2 studs are 110mm long btm ones 104mm would be easier to get another 2 top studs not enough room on btm ones to lock the 2 nuts together makes it better when screwing studs back into engine. Hardest part was the hex bar for the footrests soft as putty will make a new one with decent steel. I was really surprised took 25 mins to get box out much easier than lifting motor and gearbox out as one unit. Old box was locking up gears look ok suspect bearing on rhs.
Hope this helps others it really is quite easy, if you slacked the 2 big nuts that hold the top gearbox plates and take the 2 studs on the btm of the small plates they can be swung up out of the way.
Happy fiddeleing please use enfield approved swear words.
Hope this helps others it really is quite easy, if you slacked the 2 big nuts that hold the top gearbox plates and take the 2 studs on the btm of the small plates they can be swung up out of the way.
Happy fiddeleing please use enfield approved swear words.